iamkamatcho;189953 Wrote:
> It is a visa grant on 29/6/09.
> basically iam from Egypt (HR) and J2EE develper (IT)
> here are my time lines and some points i guess it might help:
>
> Time lines:
> - first visa lodging 15/9/08
> did not get CO and had to lodge another application after 8 months of
> waiting coz date of IELTS was after date of lodgment
> - second visa lodge was 7/4/09
> - Victoria state sponsorship granted 3/6/09
> - medicals and PCC and form 80 sent on 23/6/09 then PLE sent to CO
> informing that everything is completed
> - happlily visa granted 29/6/09 :clown
>
> Please note than the following is all just a guess from me
> - my advice to all of you is go immediatly for state sponsorship
> - Case officers vary from one to another , some look after the 28 or
> 70 days and some looks if u completed all documents and send a PLE that
> eveything is ready
> - front sending Medicals and PCC is always the best, it speed up the
> whole process
> - never ever lodge an application without completed IELTS results with
> required score in every aspect (reading, writing etc)
> - i guess reference checking is done inside DIAC on random bases , so
> they do it for some applicants and others go from all documents met to
> visa grant directly
>
> It a strange mixture between big happienss and being sad to leave the
> place where ur family and friends are living and a place which u will
> miss it's taste
>
> At the end all this process is under one valid statement "it can be a
> year , it can be tomorrow"
>
> I wish u all the best of luck and to have ur grants very soon
great news mate. all the very best for the future. i just want whats ur
profession??
--
vandm
Posted via the forums at http://www.gettingdownunder.com
|